How to install SharePoint Smart Gantt Chart

SPFx web part · about 10 minutes · Last updated · By Sean Regan

Stuck on approvals or tenant policies?

Let our team handle setup with you

Our Quick Start setup covers App Catalog deployment, permission approvals, and a guided first run, and we can help you prepare what your change board needs.

Smart Gantt Chart at a glance

Product
SharePoint Smart Gantt Chart
Type
SPFx web part (.sppkg)
Where it runs
Inside SharePoint Online pages, as the signed-in user
Admin needed
SharePoint Administrator, once, to deploy the package
Setup time
About 10 minutes
License
Free, MIT open source

Before you start

  • A Microsoft 365 tenant with SharePoint Online.
  • A tenant App Catalog site. If you do not have one, a SharePoint Administrator can create it in the SharePoint admin center under More features > Apps.
  • SharePoint Administrator or Global Administrator rights to upload and deploy the package once. End users need no elevated rights.
  • Site Owner (Full Control) rights on the site where you add the web part.

Install, step by step

  1. 1.Download the package

    Download the latest .sppkg file from the SharePoint Smart Gantt Chart GitHub Releases page. It is a single file — there is no installer and nothing runs on a server.

  2. 2.Open your tenant App Catalog

    In the SharePoint admin center, go to More features > Apps > App Catalog, then open Apps for SharePoint.

  3. 3.Upload the package

    Drag the .sppkg file into the Apps for SharePoint library. SharePoint reads the manifest and shows a trust dialog.

  4. 4.Deploy and trust

    Choose whether to make the solution available to all sites in the organization, then select Deploy. Deploying tenant-wide saves adding the app to each site individually.

  5. 5.Add the app to a site

    On the SharePoint site where you want the tool, open Settings > Add an app (or Site contents > New > App) and pick the solution. Skip this step if you deployed tenant-wide with the app auto-installed.

  6. 6.Add the web part to a page

    Edit a modern site page, click the + to add a web part, search for the tool by name, and place it on the page. Publish the page.

Your first real result, in about 10 minutes

Installing is not the win — the win is one result you can show someone. Goal: Import an existing task plan into a shareable Gantt chart with dependencies.

  1. 1.Create or import a project

    Create a blank project, import an Excel or CSV file as a new project, or import a Planner plan. Existing SharePoint task lists must first be exported to Excel or CSV.

  2. 2.Map the columns

    Map task name, start, due date, percent complete, assignee, phase, and dependencies. Numeric dates can be read as month/day/year or day/month/year.

  3. 3.Set two dependencies

    Link tasks with Finish to Start, Start to Start, Finish to Finish, or Start to Finish, adding lead or lag when needed.

  4. 4.Review the critical path

    Turn on critical-path highlighting and move a predecessor to confirm dependent tasks shift automatically across working days.

  5. 5.Set a baseline

    Save the approved dates as a baseline so the chart and task panel can show finish variance later.

  6. 6.Export the project

    Create a PowerPoint status deck, or export Excel, CSV, milestone iCal, PDF, or a high-resolution PNG.

First run: what to do next

  • Create a project — the web part provisions its own task list with the columns the timeline expects. Have an existing task list? Export it to Excel and import it.
  • Import from Microsoft Planner or Excel if the plan already exists somewhere else.
  • Set dependencies between tasks before presenting — the critical path only means something once links exist.
  • Export to PowerPoint when you need a slide for a steering meeting.

Troubleshooting

Tasks do not appear on the timeline
Tasks need both a start and a due date. Items missing either date are listed but cannot be drawn as bars.
Dates shift by a day
Check the site's regional time zone setting; date-only columns render against the site locale.
The Planner import returns nothing
You must be a member of the Microsoft 365 group backing the plan, and Graph consent for the plan scopes must be approved in the SharePoint admin center under Advanced > API access.

FAQ

Does it need its own database?
No. The web part creates SmartGantt_Projects and one ordinary SharePoint task list per project on the current site.
Can I import an existing plan?
Yes — import Microsoft Planner directly, or import Excel, CSV, XLS, or ODS. For an existing SharePoint task list, export it first and use the file importer.
Can I present the timeline?
Yes. Export a four-slide PowerPoint project report, print or save the Gantt as PDF, or download a high-resolution PNG.
Which languages does the interface support?
Smart Gantt Chart supports 30 interface languages. It follows each signed-in user's Microsoft 365 display language, or the site's default, and falls back to English when needed. Project and task data are not translated.